The EIFS was done by covering the augment with two inches of layered styrofoam and  topping that with reinforced stucco. Once that was done, the augments were painted.

The EIFS was done by covering the augment with two inches of layered styrofoam and topping that with reinforced stucco. Once that was done, the augments were painted. (Barry Byers)