Step One: Foundation

Step One: Foundation


How to Build a Monolithic Dome

Monolithic Domes are constructed following a patented method that requires a tough, inflatable Airform, steel-reinforced concrete and a polyurethane foam insulation. Each of these ingredients is used in a technologically specific way.

Step One:

The Monolithic Dome starts as a concrete ring foundation, reinforced with steel rebar. Vertical steel bars embedded in the ring later attached to the steel reinforcing of the dome itself. Small domes may use an integrated floor/ring foundation. Otherwise, the floor is poured after completion of the dome.

Step Two:

An Airform – fabricated to the proper shape and size – is placed on the ring base. Using blower fans, it is inflated and the Airform creates the shape of the structure to be completed. The fans run throughout construction of the dome.

Step Three:

Polyurethane foam is applied to the interior surface of the Airform. Entrance into the air-structure is made through a double door airlock which keeps the air-pressure inside at a constant level. Approximately three inches of foam is applied. The foam is also the base for attaching the steel reinforcing rebar.

Step Four:

Steel reinforcing rebar is attached to the foam using a specially engineered layout of hoop (horizontal) and vertical steel rebar. Small domes need small diameter bars with wide spacing. Large domes require larger bars with closer spacing.

Step Five:

Shotcrete – a special spray mix of concrete – is applied to the interior surface of the dome. The steel rebar is embedded in the concrete and when about three inches of shotcrete is applied, the Monolithic Dome is finished. The blower fans are shut off after the concrete is set.

Step Two: Airform

Step Two: Airform

Step Three: Polyurethane Foam

Step Three: Polyurethane Foam

Step Four: Steel rebar

Step Four: Steel rebar

Step Five: Shotcrete

Step Five: Shotcrete