Step 10 — After a day or two, remove the Airform from the exterior of the EcoShell II. A coating should be considered and applied to protect the concrete from drying and to provide long term protection from leaks.

Step 10 — After a day or two, remove the Airform from the exterior of the EcoShell II. A coating should be considered and applied to protect the concrete from drying and to provide long term protection from leaks.